Safety & PMA
Boom Lift Work Next to Roads and Public Areas: A Safety Checklist
By Jonah Tan, Equipment Specialist · · 3 min read

Some jobs cannot be done inside a fenced site: facade repairs on a housing block, signage over a shop front, lights over a road or work under a bridge. Using a boom lift next to traffic and the public adds risks that a normal construction site does not have. Use this checklist before you lift.
1. Get the approvals first
If the machine, the barricades or the boom will use road space, a footpath or a car park, you usually need approval from the local authority, road owner or building management first. Allow time for it, and keep the approval on site.
2. Barricade the whole working area
The photo above shows how it should look: the boom lift stands behind water-filled barriers and traffic cones, so cars and people cannot get close.
- Barricade the whole area the boom can reach as it moves, not just the base of the machine.
- Leave a safe walkway for pedestrians around the work area, with clear signs.
- Use lights and reflective signs at night or in poor light.
3. Manage the traffic
- Use flagmen or a traffic controller when the machine is moving, being set up or working over a lane.
- Plan the work for quieter hours where possible.
- Keep the lorry, materials and the boom lift inside the barricaded zone.
4. Check overhead before you lift
Roadside work often has overhead power lines, street lights, trees and bridges. Check the full height and swing of the boom before you lift, and keep a safe distance from live cables. If in doubt, stop and ask.
5. Watch the weather
Open sites catch more wind than indoor ones. Stop work at height if there is lightning nearby or if the wind is above the limit in the machine’s manual. Rain makes surfaces slippery, so take extra care climbing in and out of the platform.
6. Keep the paperwork on the machine
Sites and inspectors often check documents on the spot. Keep the valid PMA, the inspection records, the operator’s training proof and any approvals with the machine. The paper notices taped to the boom lift in the photo are a common way of doing it. Read what a PMA certificate is and our PMA and DOSH guide.
7. Harness and rescue plan
Operators should wear a full-body harness clipped to the platform anchor point, and someone on the ground must know the ground controls and emergency lowering.
Rent a boom lift for outdoor work
For high facades and long reach from behind a barricade, a telescopic boom such as the Dingli 44m telescopic boom lift gives maximum outreach. For getting up and over obstacles, an articulating boom is often easier. Every A&G boom lift is serviced before delivery and comes with a valid PMA, with delivery to Johor, KL & Selangor. See our boom lift rental range, or WhatsApp us.






