Boom Lift Delivery: How to Prepare Your Site Before the Lorry Arrives
By Jonah Tan, Equipment Specialist · · 3 min read

A boom lift that arrives on time but cannot get onto site is a day of paid rental wasted. Most delivery problems are simple: a low gate, a soft verge, no space to offload or a guard who was not told the lorry was coming. Here is how to prepare your site before the lorry arrives.
1. Check the route into site
Walk the route from the main road to the work area before the day of delivery.
- Height: check for low beams, pipe racks, canopies and overhead cables, both for the lorry and for the machine when it drives off.
- Width and turns: look at tight gates, sharp corners and parked vehicles.
- Weight: boom lifts are heavy. Avoid drain covers, trench backfill and suspended slabs unless someone has confirmed they can take the load.
Tell us about anything unusual when you book, and we will plan the lorry and the route with you.
2. Pick a safe offloading spot
The lorry needs a firm, level area where the machine can be driven off safely, close to where it will work.
- Keep the area clear of materials, scaffold and parked cars.
- Set out cones or barriers so people and vehicles stay clear while the machine comes off the lorry, as in the photo above.
- Avoid offloading on public roads and pedestrian walkways unless your site has arranged it with the authorities.
3. Get the ground ready for the work
Where the boom lift will set up matters as much as where it is offloaded. The ground should be firm and level enough for the machine. Soft fill, fresh backfill and slopes need extra care, and on some sites, ground mats. Read our boom lift rental for data centre projects checklist for larger sites.
4. Sort out gate times and site access
Large sites, factories and data centres often control when lorries can enter.
- Book the delivery window with your site office.
- Tell the guardhouse the lorry is coming, with the vehicle details if they need them.
- Make sure someone on site can meet the driver and show where to offload.
5. Have the paperwork ready
Most sites check the machine before it is used:
- The valid PMA for the boom lift. See what a PMA certificate is.
- Proof of operator training, if your site asks for it.
- Your site’s own permit to work or lifting plan.
6. Plan the collection too
When the job is finished, the same access is needed for the lorry to collect the machine. Let us know a few days ahead, keep the route clear and park the boom lift where it can be loaded.
Book your boom lift delivery
A&G Equipment delivers boom lifts and scissor lifts from our yard in Iskandar Puteri to Johor, KL & Selangor. Every machine is serviced before delivery and comes with a valid PMA, and we can arrange operator training. See our boom lift rental range, or WhatsApp us with your site address, working height and dates.